Cavite Laguna Expressway Subsection 5 as of June 2021; Opening Soon

Have you seen the Cavite Laguna Expressway project lately? Here’s the June 2021 update of the CALAX subsection 5 from Santa Rosa Interchange to Silang East Interchange before the opening.

The project is a 4-lane 45.29 km. closed-system tolled expressway connecting CAVITEX and SLEX. It will start at the CAVITEX in Kawit, Cavite, and end at the SLEX-Mamplasan Interchange in Biñan, Laguna.

Project subsections

The project will have the following subsections:

  1. Cavitex Connection to Open Canal Interchange (8.9km)
  2. Open Canal Interchange to Governor’s Drive Interchange (10.5km)
  3. Governor’s Drive Interchange to Silang (Aguinaldo) Interchange (7.9km)
  4. Silang (Aguinaldo) Interchange to Silang East Interchange (2.9km)
  5. Silang East Interchange to Sta. Rosa-Tagaytay Interchange (5.8km)
  6. Sta. Rosa-Tagaytay Interchange to Laguna Boulevard Interchange (1.8km)
  7. Laguna Boulevard Interchange to Laguna Technopark Interchange (4.2km)
  8. Laguna Technopark Interchange to Mamplasan Toll Barrier (2.9km)

Drone pilot: Dmitri Valencia

WHAT'S NEW