Closing the Cebu-Cordova Bridge Gap as of September 2021
Look at the Cebu-Cordova Bridge gap is almost connected as of today, September 1, 2021. Guess how many meters are left to close the bridge gap.
The P30-billion CCLEX project will have two lanes in each direction that will provide safe, quick, and scenic passage to an estimated 50,000 vehicles daily, easing the traffic in the existing Marcelo Fernan Bridge and the Mandaue-Mactan Bridge.
Watch another CCLEX aerial survey.
The Cebu-Cordova Link Expressway (CCLEX) is an 8.5KM toll bridge expressway connecting Cebu City and Cordova set to open in 2021.
Drone pilot: Drive Thru Tv