NLEX–SLEX Connector Road Project Latest Update as of January 2021
Watch the January 2021 aerial update of the NLEX–SLEX Connector Road Project, an 8-kilometer all elevated 4-lane toll expressway extending the NLEX southward from the end of Segment 10 in C3 Road Caloocan City to PUP Sta. Mesa, Manila and connecting to the Skyway Stage 3, and mostly traversing the PNR rail track.
The project includes two (2) interchanges located at C3 Road/5th Avenue, Caloocan, and España, Manila.
Project benefits
At the end of construction, the project is expected to:
- reduce travel time from SLEX to NLEX from 2 hours to just 20 minutes
- reduce travel time from Clark to Calamba from approximately 3 hours to 1 hour and 40 minutes.
- benefit at least 35,000 motorists/vehicles per day
- improve connectivity between NAIA and Clark airports.
Drone pilot: Natoy