Panguil Bay Bridge Project 1st Concrete Pouring Aerial View

Here’s an aerial view of the first concrete pouring at the 3.0m Dia. Bored Pile/Pier No. 5 at the Panguil Bay Bridge Project, connecting Tangub in Misamis Occidental and Tubod in Lanao del Norte.

The bridge when completed will become the longest water-spanning bridge surpassing the San Juanico Bridge. The groundbreaking ceremony for the bridge was held on November 27, 2018.

Drone pilot: Abdul Khalid Lomangcolob

WHAT'S NEW