Roof Frames Installation at Unified Grand Central Station Aerial Update

The roof frames are currently being installed at the Unified Grand Station which will connect MRT 7, MRT 3, LRT 1, and Metro Manila Subway. Here’s the latest aerial update as of October 2021. Have you seen the progress lately?

MRT 7

The Manila Metro Rail Transit System Line 7, also known as MRT Line 7, or MRT-7, is an under-construction rapid transit line in the Philippines.

The line will traverse Quezon City and Caloocan in Metro Manila and is envisioned to spur business and commerce at its intermodal terminal station in San Jose del Monte, Bulacan.

When completed, the MRT-Line 7 will be 22.8 kilometers long, with 14 stations:

  1. North Ave.
  2. Quezon Memorial Circle
  3. University Ave.
  4. Tandang Sora
  5. Don Antonio
  6. Batasan
  7. Manggahan
  8. Dona Carmen
  9. Regalado
  10. Mindanao Ave.
  11. Quirino
  12. Secred Heart
  13. Tala
  14. SanJose Del Monte

Metro Manila Subway

The Metro Manila Subway, formerly known as the Mega Manila Subway (MMS), is an under-construction underground rapid transit line in Metro Manila, Philippines. The 36-kilometer line, which will run north-south between Quezon City, Pasig, Makati, Taguig, Parañaque, and Pasay, consists of 15 stations between the East Valenzuela and Bicutan stations. It will become the country’s second direct airport rail link after the North-South Commuter Railway, with a branch line to Ninoy Aquino International Airport.

LRT 1

As of August 11, 2021, the Cavite Extension project of the Light Rail Transit Line 1 (LRT-1) was 58.03 percent complete after the girder has been installed along the Manila – Cavite Expressway (Cavitex).